Marienkirche
Essen

Marienkirche
Essen
Marienkirche
Essen
Marienkirche
Essen

Marienkirche
in Essen

The listed Marienkirche was already closed and deconsecrated in 2008. It was then used as a warehouse and clothing store for the needy. A long-term use of the church is now to be made possible by converting it into a residential building. With the help of a wooden construction inside the church, twelve condominiums with 50 to 150 m² of living space spread over three levels have been created.

Marienkirche
at a glance

Fan-like beam structure
in the Marienkirche

Inside the church, a third row of glulam columns was added to the two existing rows of columns. The columns were connected by glulam beams.
A fan-like beam structure has been created in the semicircular choir room. The columns and beams were anchored by various connectors concreted into the existing structure.
Building project Marienkriche, Essen-Steele
Construction BSH column construction with X-LAM ceilings
Year of construction stock 1924/25
Conversion 2020-2022
Building costs 3.9 Mio. € (DIN 276 cost group 300 + 400)
Usable area 1,450 m2
Volume of the wooden components 2,100 m³
Stored CO2 1,600 tCO2
Building owner Lambert Schlun GmbH & Co. KG, Essen, www.schlun.de
Architecture of the stock City Planning Commissioner Wilhelm Stark
Architecture of the conversion Architekturbüro Dr. Ing. Hermann Klapheck – Büro für Architektur und Stadtplanung, Recklinghausen, www.dr-klapheck.de
Structural engineering LWS Ingenieurgesellschaft für Tragwerksplanung mbH, Duisburg, www.lwsing.de
Fire protection IfBW Ingenieurbüro für Brandschutz Wuppertal GmbH, Wuppertal, www.ifbw-gmbh.com
Factory planning, production and assembly of the timber construction DERIX-Group

The advantages of wood
in the Marienkirche

Since the roof could not be opened for reasons of monument protection, all components as well as the necessary construction equipment could only enter the building through windows and doorways. In addition, due to the extremely cramped conditions, it had to be ensured that the building could be assembled inside. The construction had to be precisely adapted to the existing structure and anchored there.
The low weight of the wooden components as well as the precise and flexible adjustment possibilities facilitated these challenges enormously.

Downloads
for reference

Mikado: timber construction in listed church

September 2022 • Marc Wilhelm Lennartz

Download (German article)

Further
topics

Individual glulam

With our glulam, individual constructions can be built, because we produce the components in almost any shape and size – entirely according to your wishes. The kiln-dried wooden boards are joined together by finger-jointing to form long lamellas. Discover our diverse range of glulam.

Wooden residential buildings

Learn more about building residential buildings from wood.

DERIX
Find your contact person

Your partner for timber construction

With DERIX as a strong partner at your side, you will implement your construction projects sustainably and efficiently.

DERIX
Premium

Exklusive services, newsletter & Co.

Register now and get exclusive access to extensive specialist content. Use our helpful digital service tools such as our X-LAM Designer and stay well informed with our newsletter.