Mainz-Bingen
district administration
in Ingelheim
Mainz-Bingen district administration
at a glance
Sustainable workplace
at the Mainz-Bingen district administration
The Mainz-Bingen district administration building was designed as a sustainable and energy-efficient administrative building using a hybrid timber construction method and offers workspace for around 320 people across a total area of 17,000 square metres. Completed in 2023, the building comprises around 180 offices, meeting rooms, sanitary facilities, technical and ancillary rooms, and a canteen. An underground car park and storage rooms have also been integrated into the basement.
Various sustainable timber elements were used in the construction, which offer the advantage of easy dismantling, among other things. The building consists of glued laminated timber pendulum columns and beams made of birch, as well as cross-laminated timber ceiling elements made of softwood with a concrete core. The timber construction made it possible to dispense with additional steel components, which would normally have to be clad for fire protection reasons. The façade of the building consists of a timber frame construction with around 400 individual elements and cladding made of coated, pre-greyed silver fir, which gives the building a unique appearance.
The Mainz-Bingen district administration building thus meets the requirements for designing new workspaces in a sustainable and functional manner.
| Building project | Mainz-Bingen district administration, Konrad-Adenauer-Straße 34, 55218 Ingelheim |
|---|---|
| Construction method | Hybrid timber construction:Timber frame construction made of glulam,Ceiling elements made of X-LAM,Concrete staircases |
| Construction time / completion | 2021 – 2023 |
| Total area | 17.000 m2 |
| Volume of the timber components | 1970 m3 |
| Stored CO2 in the construction | 1496 tCO2 |
| Avoided CO2 in the construction | 1795 tCO2 |
| Speed of regrowth in German forests | 59 minutes |
| Building owner | Mainz-Bingen district, www.mainz-bingen.de |
| Architect | Facility management of the Mainz-Bingen district administration, www.mainz-bingen.deCANZLER GmbH, Burgdorf, www.canzler.de |
| Engineering office | ZWP Ingenieure, Wiesbadenwww.zwp.deFast+Epp, Darmstadtwww.fastepp.com |
| Production, delivery and assembly of the wooden elements | DERIX Group |
Prizes & awards
for the district administration of Mainz-Bingen
Timber Construction Prize
Rheinland-Pfalz 2024
The Mainz-Bingen district administration building received special recognition as part of the Rhineland-Pfalz 2024 Timber Construction Award.
Downloads
to the reference

Timber Information Service: Timber Construction Prize Rheinland-Pfalz 2024
Model views
The model view of the Mainz-Bingen district administration building shows a complete representation of the building’s structural details.
It illustrates the architectural and structural elements in their entirety and makes the structure of the administration building easy to understand.