Correctional school Hamm
Accommodation made of wood
The accommodation building of the correctional school in Hamm, constructed from 84 wooden modules, was built directly opposite the school building there. The building accommodates 80 students during their training and the associated block teaching periods. The rooms and bathrooms of the accommodation were built from DERIX solid wood modules prefabricated in the factory.
Student accomodation in Hamm
at a glance
Single room
made of solid wood modules
The three-storey building is founded on a reinforced concrete floor slab. The access core, which is offset from the centre and accommodates the general areas such as lounges, kitchenettes, technical equipment and storage areas, is conventionally built in solid construction. The adjoining individual rooms for the students are made of wooden modules prefabricated in the factory.
Building project | Student accomodation in Hamm, Berliner Straße 13, 59075 Hamm |
---|---|
Construction | 84 Wooden modules |
Year of construction | 2020 |
Construction time | 10 months |
Usable area | 1,644 m² |
Living space | 1,263 m² |
Volume of the wooden components | 850 m³ |
Stored CO2 in the construction | 645.15 tCO2 |
Avoided CO2 in the construction | 774.18 tCO2 |
Regrowth speed in german forests | 26 minutes |
Building owner | Firma Heckmann Projektgesellschaft Hamm, D-Hamm |
Architects | Dipl.-Ing. Norbert Jackisch, D-Wuppertal |
Engineering office | Ripkens Wiesenkämper, Beratende Ingenieure PartGmbB, D-Essen, www.rw-ingenieure.de |
Fertigung, Lieferung und Montage der Holzmodule | DERIX-Group |
Wooden modules
in exposed wood quality
The wall and ceiling surfaces are finished in exposed wood quality with colourless paint. All rooms have double-wing, white plastic windows with underlighting and electric shutters. The heat is distributed via two convectors in the living room and bathroom. Each wood module has its own electrical sub-distribution. The furniture was produced and brought in by the correctional institution itself.
The bathrooms are equipped to a simple standard with a washbasin, WC and shower as well as a towel radiator and exhaust air. The entire bathroom fit-out had already taken place in the factory, so that only the hallway-side media for supplying the room had to be connected on site.
Further
topics
DERIX
Find your contact person
DERIX
Premium
Exklusive services, newsletter & Co.
Register now and get exclusive access to extensive specialist content. Use our helpful digital service tools such as our X-LAM Designer and stay well informed with our newsletter.